Dear user:
Pro Exchange will adjust the leverage position limit and maintenance margin rate level of some contracts during 2023-01-17 14:00-16:00 (UTC+8). For positions in open positions, please adjust the position and margin in advance to avoid forced liquidation.
The original leverage position limit and maintenance margin rate are as follows:
- ETHUSDT, ETHUSDT-USDT1715, ETHUSDT-USDT1716 and other contracts
|
|
- Contracts with a maximum openable leverage of 75X, including but not limited to LTCUSDT, XRPUSDT
Position (USDT nominal value) |
Maximum Leverage |
Maintenance margin rate |
0 < Position ≤ 10,000 |
75x |
0.65% |
10,000 < Position ≤ 50,000 |
50x |
1% |
50,000 < Position ≤ 250,000 |
20x |
2.5% |
250,000 < Position ≤ 1,000,000 |
10x |
5% |
1,000,000 < Position ≤ 2,000,000 |
5x |
10% |
2,000,000 < Position ≤ 5,000,000 |
4x |
12.5% |
5,000,000 < Position ≤ 10,000,000 |
3x |
15% |
10,000,000 < Position ≤ 99,999,999,999 |
2x |
25% |
The updated margin position limits and maintenance margin rates are as follows:
- ETHUSDT, ETHUSDT-USDT1715, ETHUSDT-USDT1716 and others
Level |
Position (USDT nominal value) |
Maximum Leverage |
Maintenance margin rate |
1 |
0 < Position ≤ 150,000 |
100x |
0.5% |
2 |
150,000 < Position ≤ 300,000 |
75x |
0.65% |
3 |
300,000 < Position ≤ 1,000,000 |
50x |
1% |
4 |
1,000,000 < Position ≤ 4,000,000 |
25x |
2% |
5 |
4,000,000 < Position ≤ 8,000,000 |
10x |
5% |
6 |
8,000,000 < Position ≤ 20,000,000 |
5x |
10% |
7 |
20,000,000 < Position ≤ 40,000,000 |
4x |
12.5% |
8 |
40,000,000 < Position ≤ 80,000,000 |
3x |
15% |
9 |
80,000,000 < Position ≤ 150,000,000 |
2x |
25% |
10 |
150,000,000 < Position ≤ 300,000,000 |
1x |
50% |
- Contracts with a maximum openable leverage of 75X, including but not limited to LTCUSDT, XRPUSDT
Level |
Position (USDT nominal value) |
Maximum Leverage |
Maintenance margin rate |
1 |
0 < Position ≤ 20,000 |
75x |
0.65% |
2 |
20,000 < Position ≤ 100,000 |
50x |
1% |
3 |
100,000 < Position ≤ 250,000 |
25x |
2% |
4 |
250,000 < Position ≤ 1,000,000 |
10x |
5% |
5 |
1,000,000 < Position ≤ 2,000,000 |
5x |
10% |
6 |
2,000,000 < Position ≤ 5,000,000 |
4x |
12.5% |
7 |
5,000,000 < Position ≤ 10,000,000 |
3x |
15% |
8 |
10,000,000 < Position ≤ 20,000,000 |
2x |
25% |
9 |
20,000,000 < Position ≤ 50,000,000 |
1x |
50% |
Note:
- Position (USDT nominal value) is the value of USDT calculated based on the tick price of a position, position (USDT nominal value) = tick price * number of positions (money).
- The highest leverage is the highest leverage available within the respective position value range.
- The maintenance margin ratio will directly affect the forced liquidation price and the users holding the position will be affected. To avoid forced liquidation, please add margin properly or reduce position.
ProEX Team
【ProEX Customer Service Center】
Service Email :support@proex.io
Official Website:https://www.proex.io/
Help Center:https://proex.zendesk.com/hc/en-us
Service Time:(UTC+8)10:00-18:00 Every Monday to Friday.
Comments
0 comments
Article is closed for comments.